Can the 8 ft. 5V Crimp Galvalume Steel 26-Gauge Roof Panel in Aluminum be overlapped?

The minimum length overlap is 6 inches

The minimum length overlap is 6" and the use of Butyl Sealant between the 2 panels is also recommended. Check with local building codes for minimum pitch and gauge requirements. Longer length panels are available through special order.