How do I install the Zinc Moss Control 50 ft. Roll with Nails?

Here is information for installing Zinc Moss Control.

The nails should be 24” apart down the center of the strip. No cement required, just a dab of a sealant under the head of the nail. Should be installed snug up to the ridge line for best results. Use 1.5” galvanized roofing nails for the installation of the zinc strip.